Sound familiar?
Lead times not factored into replenishment logic
When scheduling ignores supplier and production lead times, orders arrive too late or too early. The result is stockouts on fast movers and excess on slow ones.
Sofco integrates lead time data directly into the scheduling engine — so replenishment triggers fire at the right moment, every time.
Poor inventory turn ratios hurting margin
Low turns mean capital is sitting idle on the shelf. In competitive markets, that's a structural disadvantage that compounds over time.
Sofco's production scheduling optimises run sequences and batch sizes to reduce changeover waste and increase throughput — improving turns without sacrificing service.
For manufacturers, and especially in food and beverage, the production schedule is where strategy meets the line. Sofco's scheduling software turns your supply plan into a sequenced, constraint-aware production schedule that protects depot times, reduces changeovers and gets the most out of your assets.
Finite capacity scheduling that reflects reality
Infinite-capacity scheduling that ignores machine, labour and mould constraints produces plans that look achievable on screen and fail on the floor. Sofco schedules against finite capacity, recognising the real limits of each production asset and the sequence dependencies between them.
Campaigns, batches and multi-operation runs are modelled together, so the schedule reflects how your lines actually work rather than a simplified abstraction. The result is a plan the production team can execute without constant informal re-planning.
Changeover and sequence optimisation
Changeovers are where food and beverage manufacturers lose time and margin, through cleaning, allergen switches and format changes. Sofco optimises run sequences to minimise changeover time and waste, grouping and sequencing products to keep the line running efficiently without compromising food safety.
Batch sizing logic balances the cost of changeover against the cost of carrying stock, so you are not making tiny runs to satisfy every order or huge runs that leave you with obsolete finished goods. The trade-off is made explicitly, not by habit.
Priority-driven and deadline-aware
Not every order carries the same weight. Sofco's priority communication lets you rank orders by customer, margin or depot deadline, so when capacity is tight the schedule protects what matters most rather than falling back on first-in-first-out.
Depot and delivery times are built into the scheduling logic, so the plan hits dispatch windows and you stop losing good production to late logistics. When the plan changes, the schedule can be re-sequenced dynamically without rebuilding it from scratch.
Capturing scheduling knowledge in the system
In many plants, the scheduling logic lives in one experienced head, which makes it a risk as well as a skill. Sofco encodes your scheduling rules, constraints and preferences in the platform so the methodology is consistent, visible and transferable.
That also means the plan can be questioned and improved. Every constraint and priority is explicit, so the team can debate the rule rather than the result, and continuously refine how the lines are scheduled.
Scheduling that connects to the wider plan
Scheduling is the sharp end of planning, but it only works when it is connected upward. Sofco's scheduling takes the supply plan as its input and feeds actuals back into the planning loop, so the next plan starts from what really happened on the line, not what was assumed would happen.
That closed loop is what keeps the monthly plan and the weekly schedule from drifting apart, a common failure where planners plan one thing and the plant runs another. When schedule actuals reconcile to the plan, the whole planning cycle becomes more accurate over time.
It also gives operations a voice in the plan. Constraints the scheduler works with every day, a bottleneck asset, a recurring changeover, a labour limit, become visible to the planner, so the supply plan is built around the plant's real capability rather than an idealised version of it.
Scheduling that earns the plant's trust
Production teams only adopt a scheduling tool they trust, and trust comes from a schedule that reflects the realities they know. Sofco is configured around your actual constraints, so the schedules it produces are ones the line teams recognise as achievable, not theoretical.
That trust is what drives real use. A scheduler that is ignored in favour of a whiteboard adds no value; one the plant relies on improves utilisation, reduces changeover waste and stabilises delivery performance against depot times.
When the schedule is trusted, it becomes the single source for the line, so priorities are clear, handovers are cleaner and the gap between the plan and what actually runs closes over time rather than widening.
Sound familiar?
These are the problems our clients faced before adopting sofco.
High production costs
Frequent changeovers and cleaning
Poor product quality
Difficulty changing schedules dynamically
Knowledge held by a few key people
Missed depot times
What's included
Key features that help your teams plan smarter and act faster.
Trusted by leading companies across retail, food & beverage, manufacturing, and more



Stay in the know
Subscribe to our newsletter today.